HonduPalma
- Fuel Type Biogas
- Application Food & Beverage Industry
- kW Production 1,200 kW
- Location Negrito, Yoro, Honduras
About This Project
HonduPalma, one of the leading palm oil manufacturers in Central America ordered a complete and highly efficient 1.2MW 2G avus biogas CHP system. The fully integrated prime mover of the CHP System is a 2G avus 1200 with an MWM core engine and a capacity of 1,200 ekW/h or 9,960 MW p.a. electrical power and 1,225 kWh/th of thermal power per hour. In addition to the CHP unit, 2G Energy Inc. also supplied the complete gas treatment, including cooler, dryer/dehumidification, and the H2S removal system.
This modern biogas energy conversion plant will provide electricity to HoduPalma's factory and oil processing facility, as well as feeding surplus electricity into the utility grid. The thermal energy is fully utilized in the customers palm oil processing facility.
Additional Details
-
Total Electrical Power
1200kW -
Module
avus 1200 -
Configuration
Container Module -
Extras
Biogas treatment System