Cedar Avenue Recycling Transfer Station
- Fuel Type Biogas
- Application Landfill
- kW Production 220 kW
- Location Fresno, CA, USA
About This Project
This is a landfill LFG to Energy project in the San Joaquin Valley, California. 2G Energy Inc. was selected to supply the biogas/LFG energy conversion and CHP equipment because of reputation and experience. The scope of supply consists of a containerized 2G agenitor 206 with MAN engine, optimized for most efficient operation in LFG biogas configuration generating Electrical Power of up to 1,826 MW p.a., and approx. 244 kWh/th of Thermal Power. 2G also supplied the complete control and switchgear package, including utility interconnection. 2G Energy Inc. also received the order to supply a complete LFG biogas treatment system together with its CHP system. A special hot ambient temperature package is also included.
Additional Details
-
Total Electrical Power
220kW -
Module
agenitor 206 -
Configuration
Container Module -
Extras
Biogas Treatment System