This site, residing in Manatí, Puerto Rico is utilizing (2x) avus 1,000b units that have an output of 1142 kW each. They include the 2G Master PLC (MPLC) for load sharing and future control capabilities, for optimum efficiency and resiliency. These systems utilize LNG as fuel, eliminating the need for diesel, and reducing the company's carbon footprint.
To learn more about this project, click the downloadable project profile pdf.